Kemajuan Pekerjaan Infrastruktur Permukiman
Total Realisasi | Progres | ||||
---|---|---|---|---|---|
KOTA PALU
|
Construction of Water Distribution Pipe and House Connection in Kota Palu
|
SR
|
4000.00 Unit
|
100%
|
|
KOTA PALU
|
Construction of Water Distribution Pipe and House Connection in Kota Palu
|
Pipa JDP
|
127010.02 M
|
100%
|
|
KOTA PALU
|
Construction of Water Distribution Pipe and House Connection in Kota Palu
|
JDU
|
3413.04 M
|
100%
|
|
KABUPATEN SIGI
|
Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi
|
INTEK
|
1.00 Unit
|
100%
|
|
KABUPATEN SIGI
|
Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi
|
Hidran Umum
|
2.00 Unit
|
100%
|
|
KABUPATEN SIGI
|
Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi
|
Pipa Transmisi
|
52.00 M
|
100%
|
|
KABUPATEN SIGI
|
Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi
|
Reservoir
|
3.00 Unit
|
100%
|
|
KABUPATEN SIGI
|
Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi
|
IPA/RESERVOIR
|
1.00 Unit
|
100%
|
|
KOTA PALU
|
Optimalization of IPLT in Kota Palu and Kabupaten Sigi
|
IPLT
|
1.00 M
|
100%
|
|
KOTA PALU
|
Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu
|
Reservoir
|
2.00 Unit
|
100%
|